Sites & Hosting

Sites

We operate mining infrastructures on four continents, using exclusively decarbonized energy. Each site is designed to adapt to local conditions and the needs of electricity producers.

aménagement d'un parc
salle machines
construction site hébergement

Virunga Park – Democratic Republic of Congo

Our partnership with Virunga National Park perfectly illustrates our responsible mining approach. Since 2020, we have been utilizing surplus energy from the park’s hydroelectric plants, a UNESCO World Heritage site.

site machines hébergement
reseau electrique

Paraguay

Near the Itaipu Dam, one of the largest hydroelectric power plants in the world, we operate infrastructures powered by 100% hydroelectric energy from the region. The site is currently operating at reduced capacity due to changes in electricity pricing policies.

Oman

In Oman, BigBlock Group pioneered mining in 2022 by launching a pilot project with the management of Green Data City (GDC) in Salalah. Today, GDC is one of the largest mining hubs in the Middle East, with over 200 MW of installed capacity.

Finland

Our infrastructures operate in all climates. The Finnish Nordic cold demonstrates our ability to perform in extreme conditions.

Congo Brazzaville

Our most recent project in Central Africa. Infrastructure is currently being deployed to harness renewable energy and create territorial impact.

Hosting

Integrated hosting for our equipment or hosting of your own machines: our sites offer optimal conditions for all types of Bitcoin mining installations.

Hosting (Turnkey Solution)

The purchase of our equipment includes full hosting: transport, installation, configuration, and commissioning. A fully turnkey solution. We then ensure operation and maintenance for a percentage-based fee calculated on your net production (after deduction of electricity costs).

External Hosting

A hosting service is also available for equipment not sold by us, under specific conditions.

Our turnkey solutions


Many sustainable power plants have excess capacity, whether permanent or temporary.
Permanent excess capacity example: A hydro plant of 50MW (5 turbines of 10) operates all year on only 2 turbines.
Temporary excess capacity example: A geothermal plant runs at only 50% of its nominal power for 9 months a year.
Whatever the type of excess capacity you have—permanent or temporary, 10GW or 500KW—there is a suitable solution to turn this “surplus” into a resource. This solution is a Bitcoin mining farm: the missing link in the energy transition, making sustainable production tools more profitable.

We have experience in mining under the most extreme climatic conditions, in difficult or even hostile environments. Our solutions are compatible with hydro, geothermal, methanization, solar and wind, and even flare gas.

Design & Construction

Complete design and construction of HPC data centers: from feasibility studies to commissioning. Integrated technical expertise to make the most of excess electrical capacity.

Machines & Containers

From complete containers to individual ASICs: turnkey solutions including operation and maintenance.

Maintenance & Training

We provide complete maintenance for our sites and equipment thanks to our technical teams trained directly by manufacturers.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.