Design
The design of a high‑performance mining farm is based on an in‑depth analysis of the site and the electricity producer’s needs. Climatic parameters, geographical constraints, and operational objectives are studied to determine the optimal solution.
This approach makes it possible to select the most suitable cooling technology – air cooling, curtain wall, or hydrocooling – and to size the infrastructure according to local specificities and the priorities of electricians.

Intelligent Energy Management System
For certain electricity producers, we have developed management software that revolutionizes the operation of mining infrastructure by synchronizing it with real‑time electricity production.
Our technology creates a perfect symbiosis between energy production and computing consumption. The software continuously monitors available electrical production and automatically controls mining machines accordingly.
The system dynamically adjusts computing power based on excess electricity. When surplus production is abundant—for example, during peaks in solar or wind production—all machines operate at full capacity to make use of energy that would otherwise be lost. Conversely, if grid demand increases or production decreases, the software instantly reduces load or places some machines on standby, freeing electrical capacity for the grid.
This technology ensures optimal use of energy resources while respecting our flexibility commitments with producers. Everything operates fully automatically, without human intervention, ensuring immediate responsiveness and maximum efficiency.
Construction
We manage the entire construction process, from land preparation to commissioning. Civil engineering, electrical infrastructure, cooling systems, and equipment installation: every step is coordinated by our teams.
This integrated approach guarantees optimal coordination across all trades, on‑time delivery, and compliance with technical standards. Delivered installations are ready‑to‑use and fully operational upon activation.

Our turnkey solutions
Many sustainable power plants have excess capacity, whether permanent or temporary.
Permanent excess capacity example: A hydro plant of 50MW (5 turbines of 10) operates all year on only 2 turbines.
Temporary excess capacity example: A geothermal plant runs at only 50% of its nominal power for 9 months a year.
Whatever the type of excess capacity you have—permanent or temporary, 10GW or 500KW—there is a suitable solution to turn this “surplus” into a resource. This solution is a Bitcoin mining farm: the missing link in the energy transition, making sustainable production tools more profitable.
We have experience in mining under the most extreme climatic conditions, in difficult or even hostile environments. Our solutions are compatible with hydro, geothermal, methanization, solar and wind, and even flare gas.